Product scope
Server and network cabinets, cable management and aisle containment can be reviewed against a project schedule. PDUs and other power accessories require a separately defined configuration; servers and cooling equipment are not automatically included.
Coordinate the interfaces
Check usable mounting depth and rail clearances against the equipment schedule. Coordinate rear connectors, PDU mounting, cable paths, door access and containment interfaces. Record transport conditions separately from installed loads.
Prepare your project information
Send the rack schedule, room or row layout, equipment dimensions and weights, airflow requirements, PDU requirements and delivery access limits. Confirm assembly and packaging needs for the installation route.