Equipment & Systems

Motor Control Centres

Motor control centre line-ups with DOL, star-delta and VFD starter buckets, control power and communications per project schedule.

IEC 61439
Request a quotation
StandardsIEC 61439
To quoteSend a specification, BOQ or line item — we confirm construction, standard and lead time.
Motor Control Centres — conceptual illustration
Overview

Motor Control Centres: product guide

Motor control centres organise motor starters, control power and communications into a line-up. The catalogue includes DOL, star-delta and VFD starter arrangements.

Applications

Typical applications

Use 1Industrial motor control
Use 2Plant motor distribution and automation
SelectionOrganise the motor list by starter function and control interface before defining the MCC line-up.
Standards

Standards and project specifications

Reference standards listed for this product range:

IEC 61439

State the required standard, edition and project specification in the enquiry. Applicability depends on the selected construction and installation. A catalogue reference does not establish certification or approval for every model; identify any required certificates and test records for review.

Quotation requirements

What to send for quotation

Item 1Motor list, ratings, starting methods and single-line diagram
Item 2DOL, star-delta or VFD requirements for each motor
Item 3Control voltage, I/O, communications and layout
SpecificationAttach the BOQ, drawings or schedule, required standard and edition, and any acceptance or documentation requirements.
DeliveryState quantities, destination and requested delivery date. Include packing or handling constraints; availability and lead time are subject to quotation.
FAQ

Frequently asked questions

Can all starters be specified by motor power alone?

No. Include the starting method, load requirements, protection and control interfaces. A motor schedule should identify each starter function and associated communications.

What should accompany an enquiry?

Send the product requirements listed above with your specification or BOQ. Mark any items still to be decided so that construction, documentation and delivery requirements can be reviewed before quotation.

Request a Quote

Discuss your Motor Control Centres requirements. Include the application, specification and quantities with your enquiry.

Request a quotation